![Post Soho Square](https://cdn.prod.website-files.com/5e7ce7f4258ee123cbee4220/600f0e3828413225bede84e3_Karins-CaseStudy-Tampa-SohoSquare-01.jpg)
RESTORING INTEGRITY. ENSURING LONGEVITY.
Karins worked on the threshold inspection services of all structural components including the post-tensioned slab of on grade, the elevated post-tensioned podium slab, the wood framing and the pre-cast concrete parking garage.